- Journal
- Année
- 2011
Abstract
Inspired by a helicopter maintenance planning problem, we study the integration of uncertainties into tactical multi-resource, multi-project planning (Rough Cut Capacity Planning). We model uncertainty by a fuzzy/possibilistic approach instead of a stochastic approach to be able to develop robust plans in situations where very limited data is available. We refer to the problem as the Fuzzy Rough Cut Capacity Problem (FRCCP). We propose an adaptation of periodic workload to fuzziness, and develop a simulated annealing meta-heuristic to solve the capacity planning problem. We apply this method to the helicopter maintenance activity within the frame of a French industrial project called Helimaintenance(1).